Partial restumping in Gippsland means replacing only the house stumps that have failed. This page covers how a part job works, what a surveyor still needs, and what to ask a builder before you agree to one.

Partial restumping in Gippsland: replacing only the failed house stumps

Partial restumping in Gippsland means replacing the house stumps that have failed and leaving the sound ones in place. One repair vendor's guide describes restumping as "replacing or renewing the stumps", and a full job renews all of them. A part job renews some. Ask whether the builder can replace only the failed stumps, and what the rest of the subfloor looks like.

We are a referral service, and we do not inspect your house, so the stumps you do not replace are not looked at by this site. Wellington Shire's building permits page covers Reblocking or restumping of an existing building and does not say whether a part job counts differently. The reblocking page covers the whole-house job.

Which stumps have failed, and who decides

A builder who has looked under the house decides which stumps have failed, and this site cannot. One industry guide says treated timber is the most vulnerable to rot and termites and needs regular pest inspections in damp areas. CSIRO says subterranean termites build shelter tubes over stumps and ant caps, and that inspections at least annually are needed (CSIRO termite guide).

So ask the builder how many stumps they inspected, how they decided which to replace, what condition the others are in and whether they will photograph each replaced stump. Ask whether the builder expects any of the others to need replacing soon. That is a question for the builder, not a conclusion from a web page. The stumps guide compares the materials.

Close view of the base of a timber house stump where the wood is dark, soft and crumbling at ground level, with damp soil around it, a sound stump beside it and the underside of a bearer above
Illustration: one rotted timber house stump beside a sound one, the case a partial job is for

Can a part job grow?

Yes, because whether bearers or joists need repair is found once the subfloor is open. A part job that starts with three stumps can turn into stumps plus a bearer. Ask how a variation is priced and agreed in writing before the work happens. A single variation process is part of the contract changes due by 1 December 2026 (Consumer Affairs Victoria on the new laws), and we have not seen the detail. The process page covers the bearers and joists step, and the cost guide covers what moves a quote.

Permits for a part job

Wellington Shire's page says "Reblocking or restumping of an existing building: Permit Required." It does not say whether a partial job is treated differently. East Gippsland, South Gippsland and the Business.gov.au page for Bass Coast do not mention restumping, so we cannot say what those councils require. One other Victorian council's guideline says a partial area is highlighted on the plans submitted for a permit. Ask a registered building surveyor what yours needs. All of this was checked 6 November 2026. The permit page goes through the four councils.

Registration and the contract threshold on a small job

A part job may be a small job, and the registration statements do not agree on small jobs. The Victorian Building Authority's 2017 notice says a builder in the business of re-blocking or restumping "is still required to be registered, regardless of the cost of the work" (the 2017 notice). The Building and Plumbing Commission says work worth more than $10,000 requires a registered builder (BPC page on engaging a builder). We did not find a BPC page that repeats the 2017 sentence, and we have not reconciled the two, so ask which registration class the builder holds and check it on the BPC register.

A major domestic building contract is needed above $10,000 and must be in writing (Consumer Affairs Victoria on major contracts). A part job may fall above or below that line, so do not assume, and ask for a written quote and contract either way. Home Warranty applies where the project is valued at more than $20,000, so if your contract is over the threshold, ask for the notice of cover. Deposit limits apply, and they change by 1 December 2026, so check the current limit with Consumer Affairs Victoria. All of this was checked 6 November 2026.

Ask which stumps stay, and why the builder is sure they are sound.

Choosing the replacement stumps

Ask whether the new stumps match the old ones and why, and what the surveyor will accept. The stumps guide covers timber, concrete and galvanised steel, and none of the sources we read ranks them for a Gippsland town. If the quote is for a part job on a house you rarely visit, the quote checklist lists what to have in writing, and the contact form is where to send the details.

What this page cannot do

It cannot tell you which stumps under your house have failed, whether the rest will last, or whether a part job is enough. Only a builder or inspector who has been under the floor can say. It cannot say whether a permit applies to a part job, because the pages we found are silent or do not distinguish partial work. It gives no price. A registered building surveyor decides on the permit, and the BPC register shows who is registered.

Written November 2026, checked 6 November 2026

Check the current rules before you rely on this

This page describes what the regulator and council pages we found say about permits, registration and contracts for partial restumping of a house in Gippsland. It describes the rules in general terms as they stood in November 2026, checked 6 November 2026. Standards, forms, thresholds and fees change.

The authoritative sources are Wellington Shire Council, building permits (lists 'Reblocking or restumping of an existing building: Permit Required.'), Victorian Building Authority notice, 2017: clarification of changes to registration requirements for domestic builders (predecessor of the BPC; dated), Building and Plumbing Commission (BPC), engaging a builder and CAV, new domestic building contract laws passed in Victoria (Domestic Building Contracts Amendment Act 2025; effect by 1 December 2026). Where anything here differs from those sources, they are right and we are not.

We are not builders, building surveyors, regulators or lawyers. For what applies to your job, ask the builder which registration they hold and check it on the Building and Plumbing Commission register, then ask a registered building surveyor and your council what is needed. Contract, deposit and payment rules change by 1 December 2026.

Accurate at the time of writing, November 2026. Always check the source before relying on it.

Questions

Common questions

Can I replace only the rotten stumps?

Ask the builder. One repair vendor's guide describes restumping as replacing or renewing the stumps, and a partial job replaces the failed ones. Whether a part job suits your house depends on the condition of the rest, which the builder must look at. Ask what they found, which stumps they would leave and why, and have it written in the quote.

How do I know which stumps have failed?

A web page cannot tell you. One industry guide says treated timber is the most vulnerable to rot and termites. CSIRO says termites build shelter tubes over stumps and ant caps. Ask the builder to show you photographs of each stump they would replace and each they would keep, and to explain the difference they saw.

What is a partial job's permit position?

Wellington Shire's page says "Reblocking or restumping of an existing building: Permit Required." and does not say whether a partial job is treated differently. The other council pages we found do not mention restumping. One other Victorian council's guideline says the area is highlighted on the plans. Ask a registered building surveyor. All of this was checked 6 November 2026.

Do bearers and joists get repaired in a part job?

Only if they need it, and that is found once the subfloor is open. So a part job can grow. Ask the builder to put in writing what happens if a bearer or joist is found to be damaged, how the extra work would be priced, and that you will be asked to agree before it goes ahead.

Does a part restump change the floor level?

No source we found says. Replacing some stumps under a house that has moved may or may not change the level of that part of the floor, and relevelling is a separate job. Ask the builder whether the quote includes levelling the area, to what standard, and who repairs doors or plaster that are affected.

How should a variation on a part job be agreed?

In writing, before the extra work starts, with the reason and the change to the price stated. Consumer Affairs Victoria says a single variation process is part of the contract changes due by 1 December 2026, but we have not seen the detail. Ask the builder how variations will be handled under your contract.

Should the replacement stumps match the old ones?

We found no source that says they must or must not. Ask the builder why they propose the material they do, whether it suits the stumps that stay, and what the surveyor will accept. The stumps guide compares timber, concrete and galvanised steel using one industry guide, and none of the sources ranks them for a Gippsland town.

Does the registration rule still apply to a small job?

The pages do not agree. A 2017 Victorian Building Authority notice says a builder in the business of re-blocking or restumping is "still required to be registered, regardless of the cost of the work". The BPC page we found says work worth more than $10,000 requires a registered builder. Check the builder on the BPC register.

Next step

Send the town and what the house is doing

The town, the type of house, whether anyone lives in it and what you have noticed under or inside it. That is usually enough for a builder to ask the right questions before an inspection.